Update elasticsearch Docker tag to v8.13.0 #8

Merged
renovate merged 1 commit from renovate/elasticsearch-8.x into main 2024-04-04 12:25:19 +02:00
Collaborator

This PR contains the following updates:

Package Type Update Change
elasticsearch final minor 8.12.2 -> 8.13.0

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | elasticsearch | final | minor | `8.12.2` -> `8.13.0` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzNy4yNzEuMSIsInVwZGF0ZWRJblZlciI6IjM3LjI3MS4xIiwidGFyZ2V0QnJhbmNoIjoibWFpbiJ9-->
renovate added 1 commit 2024-03-26 21:17:36 +01:00
Update elasticsearch Docker tag to v8.13.0
All checks were successful
continuous-integration/drone/push Build is passing
9658a989f5
renovate scheduled this pull request to auto merge when all checks succeed 2024-03-26 21:17:36 +01:00
Author
Collaborator

Branch automerge failure

This PR was configured for branch automerge. However, this is not possible, so it has been raised as a PR instead.


  • Branch has one or more failed status checks
### Branch automerge failure This PR was configured for branch automerge. However, this is not possible, so it has been raised as a PR instead. ___ * Branch has one or more failed status checks
renovate merged commit 9658a989f5 into main 2024-04-04 12:25:19 +02:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: aaron/elasticsearch#8
No description provided.